sales@jitaivalve.com    +86-577-86613556
Cont

Have any Questions?

+86-577-86613556

Jun 08, 2021

How to Do Maintenance for Pressure Seal Gate Valves

13

1. Introduction to Pressure seal gate valve


1.1 . The working principle and function of the pressure seal gate valve: 


Pressure seal gate valves are cut-off valves, usually installed on pipes with a diameter greater than 100mm , to cut off or connect the flow of medium in the pipe. The gate valve has the advantages of low switching effort and low flow resistance. However, the sealing surface is easy to wear and leak, the opening stroke is large, and the maintenance is difficult. 


The gate valve cannot be used as a regulating valve and must be in the fully open or fully closed position. 


When the gate valve is closed, the valve stem moves downward depending on the sealing surface of the gate valve and the sealing surface of the valve seat to be highly smooth, flat and consistent. They fit each other to prevent the medium from flowing through, and rely on the top wedge to increase the sealing effect. The closing part moves along the vertical direction of the center line. 


1.2 Structure: 


The valve bonnet-body joint of the gate valve adopts a self-sealing configuration. The connection between the bonnet and the valve body is to use the upstream pressure of the medium in the valve to force the sealing grasket and thrust ring to be compressed to achieve the purpose of sealing. 


The gate valve packing is sealed with high-pressure graphite packing. The gate valve structure is mainly composed of the valve body, the valve bonnet, the yoke, the valve stem, the left and right wedges, and the packing seal device. 


The valve body material is divided into two types: carbon steel and alloy steel according to the pressure and temperature of the pipeline medium. Generally installed in the valve of superheated steam system, t > 450 ℃ , the valve body is made of alloy material, such as boiler exhaust valve. 


2. Overhaul process of gate valve 


2.1 Valve disassembly: 


2.1.1 Remove the fixing bolts of the upper yoke of the bonnet, unscrew the nuts of the four bolts on the bonnet, turn the stem nut counterclockwise to separate the valve frame from the valve body, and then use a lifting tool to lift the yoke down. Put it in the right place. The stem nut is to be disassembled for inspection. 


2.1.2 Take out the retaining ring at the sealing thrust ring of the valve body, and press down the bonnet with a special tool to make a gap between the bonnet and the quadruple ring. Then take out the quad ring in sections. Finally, use a lifting tool to lift the valve cover together with the valve stem and the valve clack out of the valve body. Put it on the maintenance site, and pay attention to prevent damage to the valve clack joint surface. 


2.1.3 Clean the inside of the valve body, check the joint surface of the valve seat, and determine the maintenance method. Cover the disassembled valve with a special cover plate or cover, and stick the seal. 


2.1.4 Loosen the hinge bolts of the stuffing box on the valve cover. The packing gland is loosened and the valve stem is unscrewed. 


2.1.5 Remove the upper and lower splints of the disc frame, take out the left and right discs, and keep the internal universal top and gasket. Measure the total thickness of the gasket and make a record. 


2.2 Repair of valve parts: 


2.2.1 The joint surface of the gate valve seat should be ground with a special grinding tool ( grinding gun, etc. ) . Grinding can use abrasive sand or emery cloth. The method is also from coarse to fine, and finally polishing. 


2.2.2 The joint surface of the valve clack can be grinded by hand or with a grinding machine. If the surface has a deep pit or groove, it can be sent to a lathe or grinder for micro processing, and it will be polished after all leveling. 


2.2.3 Clean the bonnet and the sealing packing, remove the rust and dirt on the inner and outer walls of the packing press ring, so that the press ring can be smoothly inserted into the upper part of the bonnet, and it is convenient to compress the seal packing. 


2.2.4 Clean the inner packing of the valve stem stuffing box, check whether the inner packing seat ring is intact, the gap between the inner hole and the cutting rod should meet the requirements, and the outer ring and the inner wall of the stuffing box should not be jammed. 


2.2.5 Clean the rust on the packing gland and pressure plate, and the surface should be clean and intact. The gap between the inner hole of the gland and the cutting rod should meet the requirements, and the outer wall and the stuffing box should be free from jams, otherwise repairs should be carried out. 


2.2.6 Loosen the hinge bolts, check that the threaded part is intact and the nut is intact, can be lightly screwed to the root of the bolt by hand, and the pin should be flexible to rotate. 


2.2.7 Clean up the rust on the surface of the valve stem, check for bends, and straighten if necessary. The trapezoidal thread part should be intact, without breakage and damage, and be coated with lead powder after cleaning. 


2.2.8 Clean the quad ring and the surface should be smooth. The plane must not have burrs or curling edges. 


2.2.9 All fastening bolts should be cleaned, the nuts should be complete and flexible, and the threaded parts should be coated with lead powder. 


2.2.10 Clean the stem nut and internal bearing: 


①Remove the valve stem nut lock nut and the fixing screw of the housing, and unscrew the lock screw in a counterclockwise direction. 


②Take out the stem nut and bearing, disc spring, and clean it with kerosene. Check whether the bearing rotates flexibly and whether there are cracks in the disc spring. 


③Clean the stem nut, check whether the inner bushing trapezoidal thread is intact, and the fixing screw with the shell should be firm and reliable. The bushing wear should meet the requirements, otherwise it should be replaced. 


④ Apply butter to the bearing and insert the stem nut. Disc springs are combined as required and reassembled in sequence. Finally, lock it with a lock nut, and then fix it firmly with a screw. 


2.3 Assembly of gate valve: 


2.3.1 Mount the qualified left and right discs on the stem clamp ring and fix them with the upper and lower clamps. The inside of it should be put into the universal top, and the adjustment gasket should be tested according to the maintenance condition. 


2.3.2 Insert the valve stem together with the valve disc into the valve seat for test inspection. After the valve disc and the sealing surface of the valve seat are in full contact, it should be ensured that the sealing surface of the valve disc is higher than the sealing surface of the valve seat and meets the quality requirements. Otherwise, it should be adjusted. The thickness of the gasket at the top until it is suitable, and the anti-return gasket is used to seal it to prevent it from falling off. 


2.3.3 Clean the valve body, and wipe the valve seat and disc. Then put the valve stem and the valve disc into the valve seat, and install the valve cover. 


2.3.4 Install sealing packing as required on the self-sealing part of the bonnet. The packing specification and number of turns should meet the quality standard. The upper part of the packing is pressed tightly with a pressure ring, and finally closed with a cover plate. 


2.3.5 Assemble the quadruple ring in sections one by one, use a retaining ring to expand it to prevent it from falling off, and tighten the nut of the bonnet lifting bolt. 


2.3.6 Fill the valve stem sealing stuffing box with the packing as required, insert it into the performance gland and pressure plate, and check it tightly with a hinge screw. 


2.3.7 Install the bonnet frame, rotate the upper stem nut to make the frame fall on the valve body, and fasten it with connecting bolts to prevent it from falling off. 2.3.8 Install the valve electric drive device; the top wire of the connection part should be tightened to prevent it from falling off, and manually test whether the flap switch is flexible. 2.3.9 The valve nameplate is clear, intact and correct. The maintenance records are complete and clear; and the experience has been accepted as qualified. 


2.3.10 The pipelines and valves have complete insulation, and the maintenance site should be cleaned. 


3. Acceptance standards for gate valve maintenance 


3.1 Valve body: 


3.1.1 The valve body should be free of defects such as blisters, cracks and scouring, and should be dealt with in time after discovery. 


3.1.2 There should be no debris in the valve body and pipeline, and the inlet and outlet should be unblocked. 


3.1.3 The screw plug at the bottom of the valve body should ensure reliable sealing and no leakage. 


3.2 Valve stem: 


3.2.1 stem curvature should be less than the full length 1 / 1000 , or should be straightened or replaced. 


3.2.2 stem buttress thread portion should be intact, no broken buckle, snaps and other defects, wear amount not greater than the thickness of the buttress thread 1 / 3 . 


3.2.3 The surface is smooth and clean, free of rust and scale, and no flaky corrosion or surface delamination phenomenon is allowed in the sealed contact part with the packing, and the depth of the uniform corrosion point is ≥0 . Those over 25 mm should be replaced with new ones. The finish should be guaranteed to be above ▽ 6 . 


3.2.4 The connecting thread should be intact and the pins should be fixed reliably. 


3.2.5 After the stub and stub nut are combined, they should rotate flexibly, without jamming during the full stroke, and the threads should be coated with lead powder for protection. 


3.3 Packing seal: 


3.3.1 The pressure and temperature of the packing used should meet the requirements of the valve medium, and the product should be accompanied by a certificate or necessary test appraisal. 


3.3.2 Packing specifications should meet the size requirements of the sealed box, and should not be replaced by packing that is too large or too small. The height of the packing should meet the valve size requirements, and a thermal tight margin should be reserved. 


3.3.3 filler interfaces should be cut oblique , angle of 45 ° angle , each of the ring interface should be staggered 90 [deg.] - 180 [[deg.], The length should be suitable for the cut filler, into the stuffing box should not have a gap at the interface or superimposed Phenomenon. 


3.3.4 packing seat, the packing gland should be in good condition, no rust, the stuffing box should be clean, smooth, the gap of the door lever and the seat should be 0.1 - 0.3 mm, the maximum does not exceed 0.5 mm, packing gland, race periphery of the inner wall of the stuffing box gap of 0.2 - 0.3 mm, the maximum does not exceed 0.5 mm. 


3.3.5 After the hinge bolts are tightened, the pressure plate should remain flat and evenly tightened. The inner hole of the packing gland and the pressure plate should be consistent with the clearance around the valve stem. Packing gland packing is pressed into its chamber height dimensions should be L / . 


3.4 Sealing surface: 


3.4.1 the service valve and the valve seat sealing surface should be no spots, trenches, contact portions share valve orifices width 2 / 3 or more, the surface finish should reach ▽ to 10 or more. 


3.4.2 assembly test flap, which flap shall ensure the valve seat is inserted above the seat . 5 - . 7 millimeters to ensure shutting. 3.4.3 When assembling the left and right discs, ensure that the self-adjustment is flexible, and the anti-falling device should be intact and reliable. 3.5 Stem nut: 3.5.1 The inner bushing thread should be intact, and there should be no broken buckles or random buckles, and the fixing with the outer shell should be reliable and no looseness. 3.5.2 All bearing components should be intact and flexible to rotate. There are no flaws, such as cracks, rust, heavy leather, etc. on the surface of the inner jacket and the steel ball. 3.5.3 The disc spring should be free of cracks and deformation, otherwise it should be replaced with a new one. 3.5.4 The fixing screws on the surface of the lock nut shall not be loosened. The stem nut rotates flexibly, and the axial clearance is guaranteed but not more than 0.35 mm.


4. Gate valve maintenance process and acceptance standards


Serial number

Overhaul items

Process points

Quality requirements

1

Visual inspection   of valve body

1. Remove dirt and   remove heat preservation

2. Check the   surface of the valve body for defects such as heavy skin, cracks, blisters,   etc.

No heavy skin,   cracks, or blisters on the surface of the valve body

2

Valve   disintegration

1. Make a record   of cooperation before disintegration.

2. The valve is in   the open state when it is disassembled.

3. Pay attention   to the order of disassembly and assembly.

4. Do not damage   parts.

5. Clean the   removed bolts and parts.

6. Perform a   spectral review of the internal parts of the alloy steel valve

1. Bolts and parts   should be in good condition.

2. The internal   parts of the alloy steel valve have passed the spectral inspection.

3

Valve stem   inspection and repair

1. Clean up the   dirt on the surface of the valve stem and check the defects of the valve   stem.

2. Straighten or   replace if necessary.

3. Carry out   surface nitriding treatment as appropriate.

1. The curvature   of the stem is not more than 1% of the full length of the stem, and the   out-of-roundness is less than 0.05mm.

2. The valve stem   should be smooth, free of pitting, scratches, and cracks. The uniform   pitting depth of the contact part of the valve stem and the packing is not   more than 0.3mm, and there is no defect in other parts.

3. The valve stem   thread is intact and should be replaced when the wear exceeds 1/3 of the   original thickness.

4

Inspection and   repair of valve plate, valve seat and valve body

1. Check the valve   plate, valve seat and valve body for cracks, grooves and other defects.

2. Use red lead   powder to check the fit of the sealing surface, and determine the repair   process and grinding method according to the inspection.

3. Polish the   joint surface of the valve body and the self-sealing gasket, and replace the   detachable valve seat that cannot be repaired.

4. Check whether   the joint surface of the valve seat and the valve body is firm.

1. There are no   cracks or grooves on the valve plate, valve seat and valve body.

2. The sealing   surface should be straight, the roughness of the sealing surface should be   less than 0.1µm, the radial coincidence should not be less than 80%, and the   circumference of the sealing surface should be in uniform contact without   wire breakage.

3. There is no   foreign matter and other defects inside the valve body.

4. The joint   surface of the valve body and the self-sealing gasket is smooth without   grooves.

5. The valve body   is firmly combined with the valve seat, and there is no looseness.

5

Check and repair   of valve cover

1. Clean the   stuffing box and polish the inner wall of the stuffing box, the packing gland   and the seat ring.

2. Polish the   joint surface of the valve cover and the sealing gasket.

1. The inner wall   of the stuffing box, the gland of the stuffing box and the seat ring are   smooth and clean.

2. The joint   surface of the valve cover and the sealing gasket is smooth and clean.

6

Inspection and   repair of bracket

1. Clean the   thrust bearing and check whether the bearing is worn or not. Corroded   and broken.

2. Check the stem   nut on the bracket.

3. Check whether   the bracket is damaged.

4. Polish the   joint surface of the valve body.

1. The bearing   quality meets the requirements, otherwise it must be replaced.

2. The stem nut is   intact.

3. No damage to   the bracket.

4. The connecting   surface of the valve body is flat.

7

Repair of quad   ring (six ring), gaskets, etc.

1. Polish the quad   ring and washer.

2. Check the   material and hardness of the quadruple ring.

1. The four ring   and washer are smooth and free of corrosion. The quadruple ring has   uniform thickness, no damage or deformation. The gasket has no defects   such as deformation and cracks.

2. The material   and hardness of the quadruple ring meet the requirements.

8

Valve assembly

1. When the valve   is assembled, the valve should be in an open state.

2. Assemble in the   order of cooperation.

3. Replenish   lubricant.

4. Replace the   packing.

5. Adjust the   contact area between the gate and the valve seat.

6. Install the   quadruple ring in order.

7. Evenly tighten   all connectors.

8. Check the gaps   of all parts

1. When the valve   is closed, the center line of the valve plate should be higher than the   center of the valve seat.

2. The valve stem   is firmly connected to the valve plate, and the valve stem is in good   agreement.

3. The gap between   the gasket and the valve body bonnet is 0.1-0.3mm.

4. The gap between   the valve stem and the gland is 0.1-0.3mm.

5. The gap between   the packing and the gland is 0.1-0.15mm.

6. The gap between   the valve stem and the seat ring is 0.1-0.2mm.

7. The gap between   the seat ring and the stuffing box is 0.1-0.15mm.

8. The accessories   and signs are complete, and the valve body is well insulated.

9

Switch test

Proofread the   switch indication, check the switch situation

The valve has no   jamming and false travel during the full stroke of the switch

10

Replace with new   valve

1. Disassembly   inspection of the valve and necessary spectral inspection

2. 100% flaw   detection of butt welds.

3. Water pressure   test when necessary.

1. All parts are   in good condition, and the quality of the material and gate valve meets the   requirements.

2. The welding   joint quality is qualified.

3. There is no   leakage on each joint surface and sealing surface during hydraulic test.

 


Send Inquiry